Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Product > Production Process > #2CPL (No.2 Coil Preparation Line)

#2CPL (No.2 Coil Preparation Line)
 

Function : Inspecting pinholes, checking thickness and surface defects.Applying rust preventive oil.To cut to the required width and coil weight.

#2CPL (No.2 Coil Preparation Line)

Capacity

250,000 tons / year

Dimension

Thickness(mm)

Width(mm)

Max Weight(ton)

Entry Coil

0.17 - 0.39 

700 - 1,100 

20

Delivery Coil

0.17 - 0.39 

700 - 1,100 

20

 

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

<<back