Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Product > Production Process > #1CPL (No.1 Coil Preparation Line)

#1CPL (No.1 Coil Preparation Line)
  Function:   Improving flatness of strip by using tension leveler. Checking for thickness, inspecting surface defects, applying rust preventive oil and cut to the required width and coil weight.
#1CPL (No.1 Coil Preparation Line)

Capacity

290,000 tons / year

Dimension

Thickness(mm)

Width(mm)

Max Weight(ton)

Entry Coil

0.14 - 0.6 

700 - 1,350 

20

Delivery Coil

0.14 - 0.6 

700 - 1,350 

20

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

<<back